Option
Develop policy to increase capacity beyond a 3-year event (2-3 inch storm) for stormwater without a timeline that is adopted by the Commission, identify a trigger to increase the capacity in prioritized areas
Develop policy to increase capacity beyond a 3-year event (2-3 inch storm) for stormwater without a timeline that is adopted by the Commission, identify a trigger to increase the capacity in prioritized areas
