Option
A contractor will be hired to complete a feasibility to determine the most appropriate anaerobic digester system. Guam Waterworks Authority will then hire a contractor to design and build the anaerobic digester system from the results and recommendations of the study. This project will increase the workforce capacity needed to construct and operate this type of facility and will require current GWA workers to increase their skills in operating an anaerobic digester with the intent to use the methane gas produced to power the facility. This will also require additional workforce capacity to collect food and fats, oils, and grease waste from local schools, farmers, grocers, etc.
A contractor will be hired to complete a feasibility to determine the most appropriate anaerobic digester system. Guam Waterworks Authority will then hire a contractor to design and build the anaerobic digester system from the results and recommendations of the study. This project will increase the workforce capacity needed to construct and operate this type of facility and will require current GWA workers to increase their skills in operating an anaerobic digester with the intent to use the methane gas produced to power the facility. This will also require additional workforce capacity to collect food and fats, oils, and grease waste from local schools, farmers, grocers, etc.