The PVT Land Company (left) is O‘ahu’s only landfill for construction-site waste. The site receives more than 200 truckloads of construction debris per day. The company upgraded their stormwater drainage system and retention pond (right) in anticipation of increased volumes of stormwater.
PVT Landfill (left) by Victoria Keener; Stormwater Retention Basin (right) by Bill Lyon, TerraPac, LLC. Both photos used with permission.
Last modified:
18 October 2016 - 9:38am