Exposed culvert replaced by armored fill

Before (left) and after (right) photos show the results of a project to reduce sedimentation from roads in Morro Bay's upper watershed. Before the project, streams eroded around this culvert and carried soil from a loose-surface road into the bay. The culvert was removed and the road was upgraded with armored fill.

Photos courtesy of Margaret Parker. Used with permission.

Page/s that contain this image
Last modified
20 September 2016 - 1:08pm