Anticipate and plan for the skilled workforce needed to build, operate, and maintain new clean-energy infrastructure.

Details

Focus of action
Workforce, Staffing, Training
Option

Anticipate and plan for the skilled workforce needed to build, operate, and maintain new clean-energy infrastructure.

Focus of action
Workforce, Staffing, Training

Examples from plans

This option appears in resilience plans from around the country.

Option from plan Hazards Sort descending Assets Region Source Plan
Guam Power Authority estimates that contractors will install approximately 170 MW of Battery Energy Storage System (BESS). This will provide an excellent opportunity for Guam to develop the workforce capacity needed to construct these facilities. The oper Multiple or All Hazards Energy and Utilities
Guam Power Authority estimates that contractors will install 1,320,000 photovoltaic solar panels as a part of Phase IV of the renewable energy plan. This will provide an opportunity for Guam to develop the workforce capacity needed to install these system Multiple or All Hazards Energy and Utilities
Guam Waterworks Authority, Guam Transit Authority, and Department of Public Works aim to convert their fleets from traditional passenger vehicles to electric vehicles. By replacing vehicles, there will be a need to improve technical skills and knowledge a Multiple or All Hazards People
A contractor will be hired to complete a feasibility to determine the most appropriate anaerobic digester system. Guam Waterworks Authority will then hire a contractor to design and build the anaerobic digester system from the results and recommendations Multiple or All Hazards People
As King County invests in renewable energy, sustainable infrastructure, and energy-efficient buildings, this shift presents a once-in-a-generation chance to stimulate regional economic growth, create high-quality jobs, and ensure prosperity reaches all co Multiple or All Hazards People